1. Choose a focused view
Open the recommendations page. Choose the location you want to review, then narrow the table to a supplier or product group you know well. Open Columns if you need to show the relevant variance or stocking-status fields. Choose filter values or a sort direction in the column header’s dialog, then select Apply. Keep the Current and New target columns visible together. In Order/Line Points, these are Current Order Point, Current Line Point, New Order Point, and New Line Point. Current values are the imported targets; New values include applicable saved overrides and boundaries. Starting with a small group makes it easier to compare Lantern’s recommendation with your own knowledge of customers and suppliers.2. Approve small changes in groups
Once you have checked some familiar recommendations, use the table to group the changes you are comfortable accepting together. Many items need only a small adjustment, so you can often clear a large part of the review list here.- Open the Actions column filter, choose Unapproved, then select Apply to focus on work still awaiting a decision.
- Agree on the percentage changes your team is comfortable accepting. In Max Variance (%), use Between to set that range, then select Apply. In Order/Line Points, use the percentage Line Point Variance column. Include small increases and decreases. Where your table provides Max Variance ($) or dollar Line Point Variance, add a dollar range to narrow the group.
- Review the filtered group against its Current and New targets. Where Stocking Status is shown, filter out Discontinue and Start Stocking for this batch. Keep known business exceptions for separate review.
- Select the toolbar Approve and choose Filtered in the dialog. Confirm the group and item count, then select Approve [n] Items.
- Check the approval result. Clear the batch’s variance and stocking-status filters, keeping Unapproved and the supplier or location you are reviewing, to see the decisions that remain.
3. Focus on the biggest differences
Work through these three groups. Each surfaces a different decision. If your workspace does not include Stocking Status, start with target variances and follow your team’s process for reviewing stocking changes.
A large percentage change can have a small dollar impact on a low-value item.
A modest percentage change on an expensive item can matter more to your working
capital. Consider the size of the change and the item’s cost when choosing
what deserves your attention.
Include a familiar, ordinary item alongside the largest changes. The top of a
variance sort can concentrate unusual project items and old exceptions; it is
useful for finding risk, but does not represent every recommendation.
Discontinue asks whether the item should stop being routinely stocked at
this location. It does not mean dispose of the existing units or delete the
product. A 0/0 target ordinarily means no standing Min/Max stock target; check
your team’s customer-order process and any separate ERP stocking statuses.
Start Stocking asks whether holding stock is justified. An item can already
have units on hand without an ongoing replenishment target, so this label does
not mean that no inventory exists.
4. Inspect one item’s forecast
Choose an item from your shortlist and select Forecast. Start with the location you are reviewing before using the Company view for wider context. You can also select an underlined New Min or New Max in the table to see how Lantern arrived at the target. Check any override indicator before assuming the displayed New value is an untouched recommendation. Look for a reason behind the change:- Is recent demand recurring, seasonal, or concentrated in a one-off order?
- Do you know about a customer starting or ending a project?
- Would a supplier disruption or a longer replenishment time explain the target?
- Is an existing override or boundary affecting the result?
5. Make a decision you can explain
Choose the next action based on what you learned:
For example, if an unusually large customer project has ended, a recent sales
spike may not represent recurring demand. Use that fact to investigate the
forecast and decide whether a temporary adjustment is justified. Do not assume